IMPROVING YIELDS & QUALITY IN VIRAL VECTOR MANUFACTURING

Time: 1:00 pm
day: Worksho Day - Track a PM

Details:

  • Choosing an upstream production format (transient transfection, infection, packaging and producer cell line etc); impact on speed to clinic and quality of viral vector
  • Optimizing purification methods to maximize both recovery and quality; levers to pull and how to reach them
  • Innovation in analytical technologies; building process and product understanding while minimizing the “QC Tax”
  • Scaling-out vs. Scaling-up; Challenges in MFG and how to overcome them
  • Thinking outside the process; Strategies for controlling excess manufacturing costs

Speakers: